Client: 
ITER / AIR LIQUIDE 

Location:
CADARACHE (FRANCE)

Job description: 
PIPING ERECTION, STRUCTURE ERECTION, SUPPORT ERECTION, ERECTION OF EQUIPMENT (GAS BAGS, PUMPS, COMPRESSORS, TANKS, VESSELS, SKIDS, HELIUM DRYER BY SKIDDING METHOD, COLD BOXES), PNEUMATIC TEST, PAINTING

Numbers: 
Direct manhours 159.000

Date:
MARCH 2019 - JUNE 2021

Quantities:
Piping erection: 175 Tons/ 16.500 inch
Piping SS/CS (thk trom 1.6 to 9.53): 10.500" /6.000"
02 Lines (erection+Pref): 2.000"
Structure: 20 Tons
Painting: 2.150 mq
Equipment erection: n. 185 / 3100 Tons

 

Copyright © 2023 IREM S.p.A. All rights reserved. - P. Iva: 00530150895