Client: 
TOTAL / AMEC FOSTER WHEELER 

Location:
ANTWERP (BELGIUM)

Job description: 
PIPING, MECHANICAL, STEEL STRUCTURES, PAINTING, INSULATION, SCAFFOLDING WORKS,  PREFABRICATION, INSTALLATION and HOOK-UP OF MODULES - ISBL& OSBL 

Numbers: 
Direct man-hours: 1.234.867  - Indirect man-hours 221.945; Manpower peak: direct manpower 470 units, indirect manpower 66 units
 Construction Main Quantities:
  • STEEL STRUCTURES ERECTED – 1,089 Tons
  • PIPING ERECTION LARGE AND SMALL BOORE - 1,764 Tons
    DIA-IN WELDED ON SITE – 66,462
    DIA-IN WELDED IN PREFABRICATION -  89,326
  • STEAM TRACING INSTALLED – 43,6 Tons
  • STEAM TRACING STATIONS INSTALLED – 393 stations
  • EQUIPMENTS INSTALLED – 992 Tons
  • PIPERACK 2 – 9 PAR modules with:
    235 Tons of steel structure
    335 Tons of pipes
    23 Tons of steam tracing
  • TIE - IN executed (cold and hot tap) - 285

Date:
OCTOBER 2014 - NOVEMBER 2016

 